Investor’s Guide
 
Investment Advantage
Investment Procedure
Q&A
 
 
Investment Enviroment
 
·Geography Advantages
·The safe political environment
·The opened economic system
·Low labor cost
·The favorable trade status
·Geography Advantages
·The safe political environment
·The opened economic system
·Low labor cost
·The favorable trade status
 
 
 
 
Q&A
Location:Home>>Investor’s Guide>>Q&A
 
Q:Road service

Q:Rohitha

Q:Waste clean wood

Q:Power supply

Q:Utility Costs

Q:What are the conditions and planning of power generation in SSEZ currently?
A:

In Cambodia, the electricity is mainly generated by heavy oils. Because the Sihanouk Province is treated as another new economic center in Cambodia in following few years, the two Cambodian thermal power generation projects are allocated in Sihanouk Province, of which the power station (2*50MW) invested by a Malaysian company has been put into operation in 2013. In July 2013, the SSEZ Company transferred the electricity supply which is generated by the diesel-generator belonging to the SSEZ Company to electricity supplied by the Cambodian Electricity du Company (EDC) with a lower electricity price. Moreover, the self-built generator sets (4*1000KW) are set as reserve power supply when power failures happen.


«1 2 3 4 »

 
 
 
 
 

Sihanoukville Special Economic Zone
Add:No.4 National Road212km,PreybNob District,Sihanoukville,Cambodia
Hotline:855-71-8608066

 Email:consult@ssez.com

苏ICP备12065480号-1